OLVENIQ

Wellington Shelter & Feed Station

182.000,00 Kč

Tax included. Shipping calculated at checkout.

EU deliveryTracked delivery across the Czech Republic and the EU.
Statutory warranty24 months on every piece under Czech law.
Advice that helpsHonest answers on sizing and materials before you buy.

OLVENIQ Grounds — designed and installed EU-wide

Standing within days on ground screws, the Wellington is permanent shelter without permanent disruption: timber engineering, ventilated eaves and a drainage apron included.

Each element is manufactured to order in the European Union, assembled dry in our workshop for inspection, then disassembled, crated and delivered with full mounting hardware and drawings — precision you can see in every shadow-gap and weld.

Design & Craftsmanship

  • Engineered timber frame on galvanised ground screws — no concrete required in most soils
  • Kick-boarded to 1.3 m with ventilated eaves above
  • Roof membrane rated for Central European snow loads
  • Delivered in panels and standing within days, complete with drainage apron

Specifications

Footprint 12 × 4 m with feed station
Frame Engineered timber, galvanised screws
Kick boarding To 1.3 m, replaceable
Roof Snow-load rated membrane
Weight ≈ 2077 kg
Lead time 6–10 weeks

Care & Maintenance

Surfaces need only mild soap and water; avoid chlorine-based agents. Inspect fixings annually — a torque check takes minutes and keeps everything silent and true.

Questions, Answered

Heights, widths, door swings and material finishes are adapted to your building at no surcharge within standard ranges.